Deqi Automation Technology (Shanghai) Co., Ltd.
Contact:Rock Wang
Cell:+86-13601617480
Phone:+86-(0)21-67655238
Wechat:stein2000de
E-mail:deqiautomation@163.com
13601617480@163.com
Website:www.dq-intelligent.com
Address:366 Xiangjing Road, building 6, Songjiang District, Shanghai , P.R.China
How to maintain after non-standard automated assembly
Everyone knows that no matter what equipment needs to be maintained in use, the following describes the annual maintenance of the non-standard automated assembly machine (the annual maintenance is to perform several times of maintenance every year). .
1. Check whether all electrical connectors in the electrical cabinet are loose.
2. Power on and check whether the power voltage of the equipment meets the requirements.
3. The inside and outside of the equipment are clean, free of dust and falling products.
4. Replace the reducer oil.
5. The transmission gears are greased.
6. Power-on test to check whether each operating mechanism works normally.
7. After maintenance, all joysticks should be placed in a non-working state, and the electrical control switches, knobs, etc. should return to the "0" position and cut off the power.
8. Fill out the annual equipment maintenance plan.
Deqi Automation Technology (Shanghai) Co., Ltd.
Address:366 Xiangjing Road, building 6, Songjiang District, Shanghai , P.R.China
Contact:Rock Wang
Cell:+86-13601617480
Phone:+86-(0)21-67655238
Wechat:stein2000de
E-mail:deqiautomation@163.com
13601617480@163.com
Website:www.dq-intelligent.com