The national standard refers to the general requirements that general machines can be manufactured in accordance with national standards. For example, a machine that can be bought at any hardware store can be used if it is replaced with a screwdriver. Non-standard is just the opposite. Must be processed in accordance with that specific regulation. Non-standard processed parts are only owned by the manufacturer. They cannot be bought outside. The biggest advantage of our company's processing is customized processing. Non-standard automation
Mechanical non-standard parts processing technology requirements:
General technical requirements: 1. Remove oxide scale from the part; 2. There should be no scratches or abrasions on the surface of the part that damage the part surface; 3. Remove burrs and flashes.
Heat treatment requirements: 1. After quenching and tempering, HRC50 ~ 55; 2. High frequency quenching of parts, tempering at 350 ~ 370 ℃, HRC40 ~ 45; 3. Carburizing depth 0.3mm; 4. High temperature aging treatment.
Tolerance requirements: 1. Tolerances for unshaped shapes shall meet the requirements of GB1184-80; 2. Tolerances for unnoted length dimensions ± 0.5mm; 3. Casting tolerance bands are symmetrical to the basic size configuration of the blank castings.
Part edges and corners: 1. Unmarked corner radius R5; 2. Unmarked chamfers are 2 × 45 °; 3. Acute angles / sharp corners / sharp edges are dull.
Assembly process requirements:
1. Each seal must be saturated with oil before assembly;
2. The rolling bearings are allowed to be heated by oil heating, and the temperature of the oil must not exceed 100 ° C;
3. After the gear is assembled, the contact spots and backlash of the tooth surface should meet the requirements of GB10095 and GB11365;
4. Sealing packing or sealant is allowed when assembling the hydraulic system, but it should be prevented from entering the system;
5. The parts and components (including purchased parts and outsourcing parts) that have been assembled must have the certificate of the inspection department before they can be assembled;
6. The parts must be cleaned and cleaned before assembly, and there must be no burrs, burrs, scale, rust, chips, oil stains, colorants and dust;
7. Prior to assembly, review the main fit dimensions of parts and components, especially the interference fit dimensions and related accuracy;
8. The parts must not be scratched, bumped, scratched or rusted during assembly;
9. When tightening screws, bolts and nuts, do not strike or use unsuitable screwdrivers and wrenches. After fastening, the screw slot, nut, screw and bolt head must not be damaged;
10. Fasteners with specified tightening torque requirements must be tightened with a torque wrench and tightened with the specified tightening torque.
Casting process requirements:
1. No severe defects such as cold insulation, cracks, craters, and penetrating defects are allowed on the casting surface.
Deqi Automation Technology (Shanghai) Co., Ltd.
Address:366 Xiangjing Road, building 6, Songjiang District, Shanghai , P.R.China
Contact:Rock Wang
Cell:+86-13601617480
Phone:+86-(0)21-67655238
Wechat:stein2000de
E-mail:deqiautomation@163.com
13601617480@163.com
Website:www.dq-intelligent.com